Kembali ke Portofolio

Review of Vacuum Pre-Loading Implementation at Martabe TSF, Concept of TSF Wet Tailings Rehabilitation & Produce Extra Capacity for Filtered Tails Placement

Review of Vacuum Pre-Loading Implementation at Martabe TSF, Concept of TSF Wet Tailings Rehabilitation & Produce Extra Capacity for Filtered Tails PlacementSumatera Utara
Review of Vacuum Pre-Loading Implementation at Martabe TSF, Concept of TSF Wet Tailings Rehabilitation & Produce Extra Capacity for Filtered Tails Placement 1
2022
PT Agincourt Resources

Proyek Review of Vacuum Pre-Loading Implementation at Martabe TSF, Concept of TSF Wet Tailings Rehabilitation & Produce Extra Capacity for Filtered Tails Placement dilaksanakan untuk mengevaluasi efektivitas metode vacuum pre-loading dan pengembangan kapasitas fasilitas tailing storage pada area dengan kondisi tanah lunak dan potensi deformasi tanah. Lingkup pekerjaan meliputi evaluasi implementasi vacuum consolidation, analisis konsolidasi dan stabilitas tanah, review konsep rehabilitasi wet tailings, serta pengembangan optimasi kapasitas penempatan filtered tails. Tantangan utama meliputi kondisi tanah lunak, potensi penurunan dan deformasi timbunan tailing, serta kebutuhan peningkatan kapasitas dan stabilitas fasilitas tailing storage dalam jangka panjang. Solusi teknis dilakukan melalui evaluasi performa metode vacuum pre-loading dan stabilitas geoteknik, optimasi konsep rehabilitasi wet tailings dan penempatan filtered tails, serta pengembangan rekomendasi teknis guna meningkatkan stabilitas dan efisiensi pengelolaan tailing storage facility.

Jenis Layanan :
Services - Infrastructure Engineering Design