Back to Portfolio

Tender Preparation for the JORR Elevated Toll Road PPP Project

Tender Preparation for the JORR Elevated Toll Road PPP ProjectDKI Jakarta
Tender Preparation for the JORR Elevated Toll Road PPP Project 1
2021
PT Adhi Karya (Persero), Tbk

The Tender Preparation for the JORR Elevated Toll Road PPP Project was conducted to support the development of elevated toll road infrastructure in a densely developed urban area characterized by limited land availability, complex geotechnical conditions, and the need to integrate with existing infrastructure. The scope of work included geotechnical and structural evaluations, alignment and foundation analysis, development of the basic design, and technical studies to support the PPP project tender process. Key challenges included foundation stability in a dense urban environment, the effects of traffic and seismic loading, and construction constraints associated with complex existing utilities and infrastructure. The technical approach involved optimizing elevated structural and foundation systems, evaluating suitable construction methods, and developing a safe, efficient, and constructible design concept aligned with the operational requirements of an urban toll road.

Service Type:
Services - Infrastructure Engineering Design