Technical Construction Evaluation for Ngurah Rai Airport Apron Land Development – Bali
Bali
The Technical Construction Evaluation for Ngurah Rai Airport Apron Land Development in Bali was conducted to assess the stability and performance of land development works within the airport apron expansion area, where soft soil conditions and high bearing capacity requirements for aircraft operations are present. The scope of work included geotechnical and embankment assessment, settlement and ground deformation analysis, review of land development construction methods, and development of soil improvement and construction optimization recommendations. Key challenges included potential differential settlement, reclamation embankment stability, and deformation control across the apron area. The technical approach involved evaluating ground stability, recommending soil improvement and staged construction methods, and optimizing geotechnical monitoring systems to enhance the safety, stability, and long-term reliability of the airport apron area.