Back to Portfolio

Design Review Services for Pump House Works – Tenggang–Sringin Flood Control System Phase I, Package I

Design Review Services for Pump House Works – Tenggang–Sringin Flood Control System Phase I, Package ICentral Java
Design Review Services for Pump House Works – Tenggang–Sringin Flood Control System Phase I, Package I 1
2025
WIKA BNL KSO

The Design Review Services for the Pump House Works under the Tenggang–Sringin Flood Control System Phase I, Package I, were conducted to support the optimization of flood control infrastructure in an urban area through improved pump house performance and supporting systems. The scope of work included evaluation of the pump house structural and foundation design, review of excavation stability, and development of soil improvement recommendations. Key challenges included soft soil conditions, stability of hydraulic structures and excavations, pump system capacity under flood discharge conditions, and the need to ensure reliable operation of the flood control infrastructure. The technical approach involved evaluating structural capacity and stability, developing excavation staging recommendations, and proposing appropriate soil improvement measures to enhance the safety, stability, and operational reliability of the pump house infrastructure.

Service Type:
Services - Infrastructure Engineering Design