Coring Works for Patimban Port Development Project – Package 6: Container Terminal No. 2
West Java
The coring works for Patimban Port Development Project – Package 6: Container Terminal No. 2 were conducted to investigate soil conditions and pavement structures as a basis for technical evaluation and port infrastructure development. The scope of work included coring in the container terminal area, sampling of soil and pavement materials, evaluation of existing soil layers and structures, and interpretation of investigation data to support geotechnical and structural analysis. Key challenges included coastal soil conditions, the need for accurate data on subsurface layers and existing structures, and conducting investigations within a busy port operational area. The technical approach involved systematic coring and field investigations, evaluation of existing geotechnical and pavement conditions, and preparation of technical recommendations to support the development and reliability of port terminal infrastructure.